Termites

Image
Image

Termite

We Specialise in:
PRE CONSTRUCTION TREATMENT

Pre-construction anti-termite treatment is carried out from The initial stages of the construction. Our treatment is designed to create a chemical barrier between the soil and the building which prevents termites. This specialized treatment is backed by a 10-year protective service guarantee. Our treatment shall be carried out during various stages of the construction as detailed below:

  • Bottom and sides of the trenches shall be treated with our soil poisons.
  • The entire filled earth in the plinth area shall be treated with our soil poisons
  • At the external perimeter of the building also, soil poisons shall be applied by way of rodding or trenching whichever is feasible.

Thus,the building is protected against termites. This treatment is covered by a 10 year protective service guarantee. In the even of the any unlikely infestation of termites in the treated premises during the guarantee period, we shall carry out necessary treatment at no extra cost to ensure the premises free of termites.

Image

POST CONSTRUCTION TREATMENT

Termites also known as white ants; lives in colonies consists of Queen, King, Few Soldiers & large number of workers. Queen controls the colony through chemical stimulus, she can lay more than 10,000 eggs in a week. King supports queen in reproduction. Both king & queen live in anti chamber. Soldiers protect the colony & workers collect the food & feed the colony. Muddy channels & colony structure repairing is done by workers. They are blind & work for 24 hours. The infestations caused by the termites are huge like storm, cyclone, fire, flood etc. They can damage any structure in search of material containing cellulose like wood, paper & cloths.

If mud tubes are seen in building, wooden structure there will be the problem of termite in that structure. Sometimes infestation will be done to internal structure but we can’t detect it, muddy channels are also not seen. The structure gets totally infested & we can’t do anything after the damage of structure. So to avoid the undetectable infestation treating the premises against termite is very important.

Anti Termite Treatment - Covers Subterranean Termites

For Inside Premises :

The inside premises is drilled with 12mm diameter drill having 6 inch length, the drilling is done to the effective depth of 4 to 5 inches. The drilled holes are filled with anti termite chemical and the holes are sealed with cement. Then the muddy channels made by termite are sprayed to kill the live termite inside the muddy channel and after that the channels are removed and the minute hole from where the termites enters in to the premises are injected with the anti termite chemical.

For Outside premises :

The outside wall of the building, columns are drilled with the drill bit having 12 inch length & 12 mm diameter to the depth of 1 ft. If the building is stilt plus, the side corners of the columns are drilled and the holes are filled with anti termite chemical. If the mud tubes are seen, the channels are treated with anti termite chemical and then removed. All stair case, passage area and all other common portion are drilled and filled with anti termite chemical and sealed with cement.

After initial drilling procedure, check-up service is done on quarterly basis.